Reading Comprehension Directions:There are three passages in this part.Each passage is followed by some ques-tions or unfinished statements.For each of them there are four choices marked A,B,C and D.
If the Dakota Access Pipeline(输油管道)is completed,it will carry nearly half a million bar-rels of oil across four states every day.Energy Transfer Partners(ETP),a Texas-based company behind the$3.8 billion project,hopes to finish construction this year.But the Standing Rock Sioux,an American Indian tribe(部落),is determined to stop the 1,172-mile pipeline from being built.(76)Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014.A section of it will run near the Standing Rock Sioux reservation.A reservation is an area of land set aside for American Indians.The tribe says the construction threatens to destroy historical areas and ancient burial sites.They also say the pipeline could pollute their main water source,the Missouri River.In April,the Standing Rock Sioux began a protest against the project.They camped at the construction site.Since then,thou-sands of people,including people from American Indian tribes,have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks.Work-ers will also monitor it remotely,and will be able to close valves(阀)within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months.The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
(77)Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
According to the passage, which of the following statements is NOT TRUE?
A.This pipeline will cross four states.
B.This pipeline is 1,179. miles long.
C.All the protesters are from the Standing Rock Sioux.
D.Neither side of the dispute is willing to compromise.
According to the passage, the workers can__________ in case of pipeline leaks.
A.report it to the local government B.ask people to leave the leak affected areas
C.call 911 D.close valves
Why do American Indians protest against the construction of this pipeline?
A.Because it will cost up to $ 3.8 billion.
B.Because it threatens the region' s water supply.
C.Because it will make many people lose their jobs.
D.Because it will force many people to leave their homes.
ETP hopes to finish this project in__________.
A.2016 B.2017 C.2018 D.2019
Which of the following is the main idea of the passage?
A.The Dakota Access Pipeline will create more markets for oil gas.
B.The Dakota Access Pipeline will create many job opportunities.
C.American Indians oppose the construction of an oil pipeline.
D.American Indians fight for equal voting rights.