会计原理与工程财务管理-阶段测评1
- 试卷类型:历年真题
- 总 分:100分
- 时 长:120分钟
- 试卷难度:
- 考试人数:7人
热门试题
-
1.
28.下列系统中,适合采用逐步切换方式完成旧系统到新系统切换的是
-
2.
《麦琪的礼物》是美国现代著名短篇小说家_____的杰作。
-
3.
Reading Comprehension Directions:There are three passages in this part.Each passage is followed by some ques-tions or unfinished statements.For each of them there are four choices marked A,B,C and D. If the Dakota Access Pipeline(输油管道)is completed,it will carry nearly half a million bar-rels of oil across four states every day.Energy Transfer Partners(ETP),a Texas-based company behind the$3.8 billion project,hopes to finish construction this year.But the Standing Rock Sioux,an American Indian tribe(部落),is determined to stop the 1,172-mile pipeline from being built.(76)Both sides show no signs of backing down. The Dakota Access Pipeline was announced in 2014.A section of it will run near the Standing Rock Sioux reservation.A reservation is an area of land set aside for American Indians.The tribe says the construction threatens to destroy historical areas and ancient burial sites.They also say the pipeline could pollute their main water source,the Missouri River.In April,the Standing Rock Sioux began a protest against the project.They camped at the construction site.Since then,thou-sands of people,including people from American Indian tribes,have traveled to the site to join the protest. ETP says that the pipeline will have built-in safety measures to protect against oil leaks.Work-ers will also monitor it remotely,and will be able to close valves(阀)within three minutes if leaks are detected. American Indians have been staging a nonviolent protest for months.The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company. (77)Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
-
4.
Over the past decades, sea ice _____ in the Arctic as a result of global warming.(1分)
-
5.
29.企业中支持信息系统运行管理、承担信息化工具支持服务的职能机构是